NEW QUESTION # 42
The metric is the average downtime required to restore an asset or component to its full operational capabilities. MDT includes the time from failure to restoration of an asset or component.

  • A. Condition Based Maintenance Cost
  • B. Mean Downtime (MDT)
  • C. Preventive Maintenance Hours
  • D. Mean Downtime (MDT) Formula

Answer: B


NEW QUESTION # 43
Surveys have shown that plants (facilities) with good planning and scheduling systems and good predictive and preventive programs have which ratios of maintenance tasks? (Does not include service to operations or capital projects or turnarounds)

  • A. 25% of all work is preventive and predictive. 60% of work is planned and scheduled at least one week before execution, 15% of all work is emergency
  • B. 50% of all work is preventive and predictive. 80% of work is planned and scheduled at least one week before execution, 5% of all work is emergency
  • C. 30% of all work is preventive and predictive. 40% of work is planned and scheduled at least one week before execution, 20% of all work is emergency
  • D. 95% of all work is preventive and predictive. 90% of work is planned and scheduled at least one week before execution, 5% of all work is emergency

Answer: D


NEW QUESTION # 44
For maximum effectiveness maintenance tasks should be allocated to:

  • A. A contracted maintenance person to handle all aspects of maintenance.
  • B. Operations and/or maintenance depending on availability.
  • C. Multiskilled maintenance technicians performing all maintenance tasks.
  • D. Operations performing minor maintenance and multiskilled technicians performing complex maintenance tasks.

Answer: D


NEW QUESTION # 45
Which of the following inventory valuation methods may not be used at the end of the year?

  • A. Weighted average
  • B. Retail method
  • C. Specific identification
  • D. Estimated gross profit rates

Answer: D

Explanation:
The estimated gross profit rate method of inventory valuation may not be used at the end of the year.
According to the Generally Accepted Accounting Practices, this method may only be used at interim dates. If this method is used during the year, all of the reconciliations made at the end of the year must be declared. The other answer choices are all methods of inventory valuation that may be use at the end of the year.


NEW QUESTION # 46
Nearly all infrared imaging systems detect radiation in two distinct radiation bands, shortwave (2-6u) and longwave (8-14u). This would be due to:

  • A. the atmosphere being fairly transmissive to infrared radiation in these two wavebands.
  • B. most infrared lens materials being only transmissive in these to wavebands.
  • C. Infrared detectors being only available in these two wavebands.
  • D. most objects only emitting in these two wavebands.

Answer: D


NEW QUESTION # 47
The two primary costs in the classical inventory management models that are utilized to determine the Economic Order Quantity (EOQ) are the acquisition cost of inventory and the inventory possession cost.
Which of the following best describes the relationship of these costs with the number of inventory turns peryear as the number of turns per year increases?

  • A. acquisition cost increases and inventory possession cost decreases
  • B. acquisition cost decreases and inventory possession cost increases
  • C. acquisition cost increases and inventory possession cost increases
  • D. inventory possession cost and variable cost increase

Answer: A


NEW QUESTION # 48
What is the statistical average and the population standard deviation of the following series of numbers? 1.30, 1.25, 1.50, 1.12, 1.35, 1.38 Options

  • A. Statistical average = 1.32; standard deviation= 0.128
  • B. Statistical average = 1.50; standard deviation= 0.25
  • C. Statistical average = 0.128: standard deviation= 1.32
  • D. Statistical average = 1.32; standard deviation= 1.50

Answer: A


NEW QUESTION # 49
the percentage of total maintenance labor hours used to restore equipment to a functional state after a failure or when failure is imminent

  • A. Condition Based Maintenance Cost
  • B. Corrective Maintenance Hours
  • C. Preventive Maintenance Cost Formula
  • D. TOTAL MAINTENANCE TRAINING COST

Answer: B


NEW QUESTION # 50
A reliability block diagram is used in the analysis of plant machinery:

  • A. OEE (OverallEquipment Effectiveness).
  • B. productivity.
  • C. availability.
  • D. downtime.

Answer: D


NEW QUESTION # 51
When developing and presenting a new strategic plan to stakeholders, which of the following is the most important?

  • A. Implementation timetable
  • B. Craft (trade) flexibility
  • C. Establishment of a common goal
  • D. Gaining the trust of stakeholders

Answer: D


NEW QUESTION # 52
The number of unacceptable units produced during a time period (i.e. losses, rework, scrap, etc.). → Defective Units Produced

  • A. False
  • B. True

Answer: A


NEW QUESTION # 53
(%) = [Corrective Work Identified as Rework (hours) ÷ Total Maintenance Labor Hours] ×
100

  • A. Rework Formula
  • B. Preventive Maintenance Hours Formula
  • C. Corrective Maintenance Cost Formula
  • D. Uptime Formula

Answer: A


NEW QUESTION # 54
What is a standard methodology to change the frequency of a PM inspection?

  • A. (ANSI) American National Standards Institute
  • B. (RBI) Risk Based Inspection
  • C. (SMRP) Society of Maintenance & Reliability Professionals
  • D. (ASME) American Society of Mechanical Engineers

Answer: B


NEW QUESTION # 55
How do you avoid the pitfall of the Maintenance and Reliability Program appearing to have littlevalue to the organization?

  • A. Establish a comprehensive communication program including e-mail web page, and newsletter
  • B. Use a systematic approach to ensure business goals drive the effort
  • C. Claim the success of the company is directly related to the Maintenance and Reliability program
  • D. Implement all available predictive technology techniques

Answer: B


NEW QUESTION # 56
The metric is the average length of operating time between one
maintenance action and another maintenance action for an asset or component.
This metric is applied only for maintenance actions which require or result in function interruption. → Mean Time Between Maintenance (MTBM)

  • A. True
  • B. False

Answer: A


NEW QUESTION # 57
Which of the following is the best definition of a work-team?

  • A. Supervision provides all work direction and holds the team accountable for results.
  • B. Supervision defines mission, direction, and assesses performance. The team is largely self-governing and is responsible for accomplishing goals.
  • C. The team defines mission and direction Supervision and the team are responsible for accomplishing the goals.
  • D. The team defines direction and conducts peer performance assessments.

Answer: B